As a result of the tragic flooding in Odesa on September 30, a significant amount of engineering equipment was damaged. We were contacted by the management companies of residential complexes to restore the functionality of a number of pumping stations equipped with Grundfos pumps featuring MGE electronic units and CUE351 controllers. Grundfos з електронними блоками MGE та контролерами CUE351.
Our engineers performed the following work:
* Cleaning and drying of the stators;
* Replacement of bearing sets;
* Replacement of mechanical seals;
* Restoration of power and logic control modules;
* Full diagnostics and system testing before launch.
Thanks to the coordinated efforts of our team and the client's representatives, we were able to promptly restore water supply to the residential buildings.
It is particularly noteworthy that the pumping units and auxiliary equipment were de-energized in a timely manner, which allowed for the preservation of 100% of the equipment, valued at hundreds of thousands of hryvnias.
Naturally, in all circumstances—though we sincerely hope not due to such situations, but for the sake of the pumps' seamless operation—we invite you to contact our service center.
Remember, timely service is the key to reliable equipment operation and the avoidance of significant future expenditures.