photo 2026 04 02 22 33 33

The repair of the system was carried out for our client — one of the largest banks in Odesa.

A complete replacement of the transit section of the heating pipeline was performed, which runs directly through the institution’s basement premises.

Although this is a standard repair operation, the work was carried out under extremely limited conditions — in underground chambers — and its importance for the uninterrupted functioning of the system is crucial.

As a result:

🔸the client receives new pipelines;

🔸the risk of sudden rupture or emergency situation is eliminated.

Leave a Reply

Your email address will not be published.

You may use these <abbr title="HyperText Markup Language">HTML</abbr> tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

*